Report No. ARP2 (jot this number down to order)
Title Experimental Project Using Rubber Asphalt Membrane to Retard Reflection Cracking
Author(s) Meadors, Alan
Publisher Arkansas State Highway & Transportation Dept.
Pub. Date July, 1986
Pages 8
Keywords asphalt-rubber, SAM, SAMI, cracking
Description An asphalt rubber membrane was used as a stress absorbing membrane (SAM) and as a stress absorbing membrane interlayer (SAMI) over a jointed concrete pavement. This project is located on Interstate 30 in Little Rock. Approximately 5 years after the asphalt rubber membrane was placed, the project was surveyed with the following results: 1. The control section showed 25% of the joints has reflected through; 2. The SAM section averaged 25% joint reflection,and 3. The SAMI section averaged 20% joint reflection. The results indicate that the use of a SAM and/or SAMI was not effective in retarding joint reflection cracking.
Postage $ 2.00 : U.S.
$ 2.20 : Canada/Mexico
$ 2.40 : Rest of the World
[home library membership newsletter FAQ links contact events]
Membership Newsletters
Contact FAQ Library
Links Home Page Events

Rubber Pavements Association
1801 South Jentilly Lane, Suite A-2
Tempe, AZ 85281 USA
480.517.9944
480.517.9959 fax



this site is best viewed with

Netscape Navigator

v3.0 or higher

Maintained and Powered by