 |

| Report
No. |
ARP2
(jot
this number down to order) |
| Title |
Experimental
Project Using Rubber Asphalt Membrane to Retard Reflection Cracking |
| Author(s) |
Meadors,
Alan |
| Publisher |
Arkansas
State Highway & Transportation Dept. |
| Pub.
Date |
July,
1986 |
| Pages |
8 |
| Keywords |
asphalt-rubber,
SAM, SAMI, cracking |
| Description |
An
asphalt rubber membrane was used as a stress absorbing membrane
(SAM) and as a stress absorbing membrane interlayer (SAMI) over
a jointed concrete pavement. This project is located on Interstate
30 in Little Rock. Approximately 5 years after the asphalt rubber
membrane was placed, the project was surveyed with the following
results: 1. The control section showed 25% of the joints has
reflected through; 2. The SAM section averaged 25% joint reflection,and
3. The SAMI section averaged 20% joint reflection. The results
indicate that the use of a SAM and/or SAMI was not effective
in retarding joint reflection cracking. |
| Postage |
$
2.00 : U.S.
$ 2.20 : Canada/Mexico
$ 2.40 : Rest of the World |
[home library membership
newsletter FAQ
links contact
events]
Rubber
Pavements Association
1801 South Jentilly Lane, Suite A-2
Tempe, AZ 85281 USA
480.517.9944
480.517.9959 fax
this
site is best viewed with
v3.0
or higher
Maintained
and Powered
by
|