| Sieve Size | Percent Passing |
| No. 8 | 100 |
| No. 10 | 95-100 |
| No. 16 | 40-80 |
| No. 30 | 5-30 |
| No. 50 | 0-15 |
| No. 200 | 0-3 |
Rubber
for use in asphalt-rubber binder shall be free of loose fabric,
wire and other contaminants except that up to 4 percent (by weight
of rubber) calcium carbonate or talc may be added to prevent
caking or sticking of the particles together. The rubber shall
be sufficiently dry so as to be free flowing and not produce
foaming when blended with the hot paving asphalt.
At least two weeks before its intended use, the Contractor shall
furnish samples of the asphalt-rubber binder proposed for use
on the project. The samples shall consist of 4 one-quart size
cans of the asphalt-rubber binder, together with the formulation
and the grade of paving asphalt used.
The method and equipment for combining the rubber and paving
asphalt shall be so designed and accessible that the Engineer
can readily determine the percentage by weight for each material
being incorporated into the mixture.
Equipment utilized in the production and proportioning of asphalt-rubber
binder shall include the following:
An asphalt heating tank with hot oil heat transfer to heat the
paving asphalt to the necessary temperature before blending with
the granulated rubber. This unit shall be equipped with a thermostatic
heat control device.
A mechanical blender for proper proportioning and thorough mixing
of the paving asphalt and rubber. This unit shall have both an
asphalt totalizing meter (gallons or liters) and a flow rate
meter (gallons per minute or liters per minute).
An asphalt-rubber binder storage tank equipped with a heating
system to maintain the proper temperature of the binder and an
internal mixing unit capable of maintaining a homogeneous mixture
of asphalt and rubber.
The asphalt-rubber mixture shall not be used as a binder after
it has been retained for more than 48 hours.
TYPE
1 BINDER.
Type
1 asphalt-rubber binder shall be a uniform and reacted mixture
of compatible paving grade asphalt and reclaimed vulcanized rubber.
The length of the individual rubber particles shall not exceed
3/16 inch.
Type 1 asphalt-rubber binder shall contain not less than 14 percent
nor more than 20 percent rubber, by weight, of the total asphalt-rubber
binder.
The temperature of the paving asphalt shall be between 350°F
and 425°F at the time the rubber is blended with the paving
asphalt. The paving asphalt and rubber shall be combined and
mixed together in a blender unit, pumped into the agitated storage
tank, and then reacted for a minimum of 45 minutes from the time
the rubber is added to the paving asphalt. The asphalt-rubber
binder shall be maintained at a temperature of not less than
325°F nor more than 375°F during the reaction period.
The viscosity of the asphalt-rubber binder after the reaction
period, when tested in accordance with ASTM Designation D 2196,
shall be not less than 1,500 centipoise nor more than 3,000 centipoise
at 350°F (Brookfield).
The asphalt-rubber binder, after reaching the desired consistency,
shall not be held at temperatures over 325°F for more than
4 hours.
TYPE 2 BINDER.
Type
2 asphalt-rubber binder shall be a uniform and reacted mixture
of compatible paving grade asphalt, extender oil, natural rubber
and reclaimed vulcanized rubber.
Extender oil shall be a resinous, high flash point, aromatic
hydrocarbon conforming to the following:
| Test | ASTM Designation |
Requirement |
| Viscosity, SSU, at 100°F | D 88 | 2,500 Min. |
| Flash Point, COC, °F | D 92 | 390 min. |
| Molecular
Analysis: Asphaltenes, percent by weight |
D 2007 |
0.1 max |
| Aromatics, percent by weight |
D 2007 | 55 min. |
The
paving asphalt and extender oil, when combined, shall form a
material that is chemically compatible with the rubber.
The extender oil shall be added to the paving asphalt at a rate
of not less than 2 percent nor more than 6 percent by weight
of the paving asphalt, the exact amount to be as determined by
the Engineer from recommendation by the asphalt-rubber binder
supplier. The asphalt shall be at a temperature of not less than
350°F nor more than 425°F when the extender oil is added.
Rubber for use in Type 2 asphalt-rubber binder shall consist
of reclaimed vulcanized rubber and shall contain not less than
20 percent nor more than 30 percent, by weight, natural rubber,
when tested in accordance with ASTM Designation D 297: The rubber
shall contain no particles longer than 1/4 inch in length.
The paving asphalt-extender oil blend and rubber shall be combined
and mixed together in the blender unit to produce a homogeneous
mixture.
The amount of rubber to be added to the paving asphalt-extender
oil blend shall be not less than 17 percent nor more than 23
percent by weight of the combined mixture of paving asphalt,
extender oil, and rubber. The exact amount will be as determined
by the Engineer from recommendation by the asphalt-rubber binder
supplier. The paving asphalt-extender oil blend shall be at a
temperature of not less than 350°F nor more than 425°F
when the rubber is added.
The asphalt-rubber binder shall be reacted for a minimum of 45
minutes from the time the rubber is added to the paving asphalt-extender
oil blend. The asphalt-rubber binder shall be maintained at a
temperature between 375°F and 425°F during the reaction
period.
The viscosity of the asphalt-rubber binder after the maximum
reaction period, when tested in accordance with ASTM Designation
D 2196, shall be not less than 1,500 centipoise nor more than
3,000 centipoise at 375°F (Brookfield).
The asphalt-rubber binder, after reaching the desired consistency,
shall not be held at temperatures over 375°F for more than
4 hours.
AGGREGATE.
The
aggregate for Type G rubberized asphalt concrete shall conform
to the following grading and shall meet the quality requirements
specified for Type A asphalt concrete in Section 39-2.02, "Aggregate,"
of the Standard Specifications, except the loss at 500 revolutions
from the Los Angeles Rattler test shall be 40 percent maximum.
The symbol "X" in the following table is the gradation
which the Contractor proposes to furnish for the specific sieve.
| Sieve Size |
Limits
of Proposed Gradation |
Operating Range |
Contract Compliance |
| 3/4" |   | 100 | 100 |
| 1/2" | 90-100 | 90-100 | |
| 3/8" | 79-87 | X ± 5 | X ± 7 |
| No. 4 | 32-40 | X ± 5 | X ± 7 |
| No. 8 | 18-24 | X ± 4 | X ± 5 |
| No. 30 | 9-12 | X ± 4 | X ± 5 |
| No. 200 | 2-7 | 0-8 |
The symbol "X" in the following table is the gradation which the Contractor proposes to furnish for the specific sieve.
| Sieve Size |
Limits
of Proposed Gradation |
Operating Range |
Contract Compliance |
| 1/2" | 90-100 | 90-100 | |
| 3/8" | 0-68 | X ± 5 | X ± 7 |
| No. 4 | 32-40 | X ± 5 | X ± 7 |
| No. 8 | 18-24 | X ± 4 | X ± 5 |
| No. 30 | 9-12 | X ± 4 | X ± 5 |
| No. 200 | 2-7 | 0-8 |
CONSTRUCTION.
After
the material has reacted for at least 45 minutes, the asphalt-rubber
binder shall be metered into the mixing chamber of the asphalt
concrete production plant at the percentage determined by the
Engineer.
When batch type asphalt concrete plants are used to produce Type
G rubberized asphalt concrete, the asphalt-rubber binder and
mineral aggregate shall be proportioned by weight.
When continuous mixing type asphalt concrete plants are used
to produce Type G rubberized asphalt concrete, the asphalt-rubber
binder shall be proportioned by an asphalt meter of the mass
flow, coriolis effect type. The meter shall be calibrated in
accordance with California Test 109.
Type G rubberized asphalt concrete shall be spread at a temperature
of not less than 275°F nor more than 325°F, measured
in the hopper of the paving machine.
Pneumatic tired rollers shall not be used to compact Type G rubberized
asphalt concrete. Alternative compacting equipment as specified
in Section 39-6.03, "Compacting," of the Standard Specifications
shall be used to compact the Type G rubberized asphalt concrete.
Traffic shall not be allowed on the Type G rubberized asphalt
concrete for at least one hour after final rolling operations
have been completed.
When ordered by the Engineer to prevent tracking by public traffic
from the surface of Type G rubberized asphalt concrete, prior
to opening a traffic lane, sand shall be spread on the surface
at the approximate rate of from one to two pounds per square
yard. Sand shall be free from clay or organic material and shall
be of such gradation that at least 90 percent will pass the No.4
sieve and not more than 5 percent will pass a No.200 sieve. When
ordered by the Engineer, excess sand shall be removed from the
pavement surface by sweeping.
MEASUREMENT AND PAYMENT.
Rubberized
asphalt concrete (Type G-asphalt rubber) will be measured and
paid for by the ton in the same manner specified for asphalt
concrete in Section 39-8, "Measurement and Payment,"
of the Standard Specifications.
Full compensation for furnishing, spreading, and sweeping sand
cover shall be considered as included in the contract price paid
per ton for rubberized asphalt concrete (Type G-asphalt rubber),
and no separate payment will be made therefor.
10-1.
Rubberized Asphalt Concrete (Type D - Asphalt Rubber)
Rubberized
asphalt concrete (Type D-Asphalt Rubber) shall be asphalt rubber
hot mix-dense graded (ARHM-DG) and shall consist of furnishing
and mixing dense graded aggregate and asphalt-rubber binder and
spreading and compacting the mixture. Type D rubberized asphalt
concrete shall conform to the requirements specified for Type
A asphalt concrete in Section 39, "Asphalt Concrete,"
of the Standard Specifications and these special provisions.
The last sentence of the first paragraph in Section 39-2.01,
"Asphalts," of the Standard Specifications and the
fifth, sixth, seventh and eighth paragraphs of Section 39-3.03,
"Proportioning," of the Standard Specifications shall
not apply to Type D rubberized asphalt concrete. The swell, moisture
vapor susceptibility, and stabilometer value requirements in
Section 39-2.02, "Aggregate," of the Standard Specifications
shall not apply to Type D rubberized asphalt concrete.
The second paragraph in Section 39-3.05, "Asphalt Concrete
and Asphalt Concrete Base Storage," of the Standard Specifications
is amended to read:
Storage
silos shall be equipped with a surgebatcher sized to hold a minimum
of 4,000 pounds of material. A surge-batcher consists of equipment
placed at the top of the storage silo which catches the continuous
delivery of the completed mix and changes it to individual batch
delivery and prevents the segregation of product ingredients
as the completed mix is placed into storage. The surge-batcher
shall be center loading and shall be thermally insulated or heated
or thermally insulated and heated to prevent material buildup.
Rotary chutes shall not be used as surge-batchers.
The surge-batcher shall be independent and distinct from conveyors
or chutes used to collect or direct the completed mixture being
discharged into storage silos and shall be the last device to
handle the material before it enters the silo. Multiple storage
silos shall be served by an individual surge-batcher for each
silo. Material handling shall be free of oblique movement between
the highest elevation (conveyor outfall) and subsequent placement
in the silo. Discharge gates on surge-batchers shall be automatic
in operation and shall discharge only after a minimum of 4,000
pounds of material has been collected and shall close before
the last collected material leaves the device. Discharge gate
design shall prevent the deflection of material during the opening
and closing operation.
GENERAL.
Binder
for Type D rubberized asphalt concrete shall be, at the Contractor's
option, either Type 1 or Type 2 asphalt-rubber binder conforming
to the requirements of these special provisions.
The amount of asphalt-rubber binder to be mixed with the aggregate
for Type D rubberized asphalt concrete will be determined by
the Engineer using the samples of aggregates furnished by the
Contractor in conformance with Section 39-3.03, "Proportioning,"
of the Standard Specifications. The Engineer will determine the
amount of asphalt-rubber binder to be mixed with the aggregate
in accordance with California Test 367, except as follows:
The specific gravity used in Section B, "Voids Content of
Specimen" of California Test 367 will be determined using
California Test 308, Method A.
Section C, "Optimum Bitumen Content" of California
Test 367 shall be as follows:
The temperature of the aggregate at the time the asphalt-rubber
binder is added shall be not more than 325°F.
ASPHALT-RUBBER BINDER.
The
grade of paving asphalt to be used in asphalt-rubber binder will
be either grade AR-1 000, AR-2000, or AR4000, as determined by
the Engineer from recommendation by the asphalt-rubber binder
supplier.
The reclaimed vulcanized rubber shall be produced primarily from
the processing of automobile and truck tires. The rubber shall
be produced by ambient-temperature grinding processes only.
The specific gravity of reclaimed vulcanized ground rubber shall
be not less than 1.10 nor more than 1.20, and shall conform to
the following gradation when tested in accordance with ASTM Designation
C 136:
| Sieve Size | Percent Passing |
| No. 8 | 100 |
| No. 10 | 95-100 |
| No. 16 | 40-80 |
| No. 30 | 5-30 |
| No. 50 | 0-15 |
| No. 200 | 0-3 |
Rubber
for use in asphalt-rubber binder shall be free of loose fabric,
wire, and other contaminants except that up to 4 percent (by
weight of rubber) calcium carbonate or talc may be added to prevent
caking or sticking of the particles together. The rubber shall
be sufficiently dry so as to be free flowing and not produce
foaming when blended with the hot paving asphalt.
At least two weeks before its intended use, the Contractor shall
furnish samples of the asphalt-rubber binder proposed for use
on the project. The samples shall consist of 4 one-quart size
cans of the asphalt rubber binder, together with the formulation
and the grade of paving asphalt being used.
The method and equipment for combining the rubber and paving
asphalt shall be so designed and accessible that the Engineer
can readily determine the percentage by weight for each material
being incorporated into the mixture.
Equipment utilized in the production and proportioning of asphalt-rubber
binder shall include the following:
An asphalt heating tank with hot oil heat transfer to heat the
paving asphalt to the necessary temperature before blending with
the granulated rubber. This unit shall be equipped with a thermostatic
heat control device.
A mechanical blender for proper proportioning and thorough mixing
of the paving asphalt and rubber. This unit shall have both an
asphalt totalizing meter (gallons or liters) and a flow rate
meter (gallons per minute or liters per minute).
An asphalt-rubber binder storage tank equipped with a heating
system to maintain the proper temperature of the binder and an
internal mixing unit capable of maintaining a homogeneous mixture
of asphalt and rubber.
The asphalt-rubber mixture shall not be used as a binder after
it has been retained for more than 48 hours.
TYPE 1 BINDER.
Type
1 asphalt-rubber binder shall be a uniform and reacted mixture
of compatible paving grade asphalt and reclaimed vulcanized rubber.
The length of the individual rubber particles shall not exceed
3/16 inch.
Type 1 asphalt-rubber binder shall contain not less than 14 percent
nor more than 20 percent rubber, by weight, of the total asphalt-rubber
binder.
The temperature of the paving asphalt shall be between 350°F
and 425°F at the time the rubber is blended with the paving
asphalt. The paving asphalt and rubber shall be combined and
mixed together in a blender unit, pumped into the agitated storage
tank, and then reacted for a minimum of 45 minutes from the time
the rubber is added to the paving asphalt. The asphalt-rubber
binder shall be maintained at a temperature of not less than
325°F nor more than 375°F during the reaction period.
The viscosity of the asphalt-rubber binder after the reaction
period, when tested in accordance with ASTM Designation D 2196,
shall be not less than 1,500 centipoise at 350°F (Brookfield).
The asphalt-rubber binder, after reaching the desired consistency,
shall not be held at temperatures over 325°F for more than
4 hours.
TYPE 2 BINDER.
Type
2 asphalt-rubber binder shall be a uniform and reacted mixture
of compatible paving grade asphalt, extender oil, natural rubber
and reclaimed vulcanized rubber.
Extender oil shall be a resinous, high flash point, aromatic
hydrocarbon conforming to the following:
| Test | ASTM Designation |
Requirement |
| Viscosity, SSU, at 100°F | D 88 | 2,500 Min. |
| Flash Point, COC, °F | D 92 | 390 min. |
| Molecular
Analysis: Asphaltenes, percent by weight |
D 2007 |
0.1 max |
| Aromatics, percent by weight |
D 2007 | 55 min. |
The
paving asphalt and extender oil, when combined, shall form a
material that is chemically compatible with the rubber.
The extender oil shall be added to the paving asphalt at a rate
of not less than 2 percent nor more than 6 percent by weight
of the paving asphalt, the exact amount to be as determined by
the Engineer from recommendation by the asphalt-rubber binder
supplier. The asphalt shall be at a temperature of not less than
350°F nor more than 425°F when the extender oil is added.
Rubber for use in Type 2 asphalt-rubber binder shall consist
of reclaimed vulcanized rubber and shall contain not less than
20 percent nor more than 30 percent, by weight, natural rubber,
when tested in accordance with ASTM Designation D 297. The rubber
shall contain no particles longer than 1/4 inch in length.
The paving asphalt-extender oil blend and rubber shall be combined
and mixed together in the blender unit to produce a homogeneous
mixture.
The amount of rubber to be added to the paving asphalt-extender
oil blend shall be not less than 17 percent nor more than 23
percent by weight of the combined mixture of paving asphalt,
extender oil, and rubber. The exact amount will be as determined
by the Engineer from recommendation by the asphalt-rubber binder
supplier. The paving asphalt-extender oil blend shall be at a
temperature of not less than 350°F nor more than 425°F
when the rubber is added.
The asphalt-rubber binder shall be reacted for a minimum of 45
minutes from the time the rubber is added to the paving asphalt-extender
oil blend. The asphalt-rubber binder shall be maintained at a
temperature between 375°F and 425°F during the reaction
period.
The viscosity of the asphalt-rubber binder after the reaction
period, when tested in accordance with ASTM Designation D 2196,
shall be not less than 1,500 centipoise nor more than 3,000 centipoise
at 375°F (Brookfield).
The asphalt-rubber binder, after reaching the desired consistency,
shall not be held at temperatures over 375°F for more than
4 hours.
AGGREGATE.
The aggregate for Type D rubberized asphalt concrete shall conform to the 3/4" maximum, medium grading and shall meet the quality requirements specified for Type A asphalt concrete in Section 39-2.02, 'Aggregate," of the Standard Specifications, except the loss at 500 revolutions from the Los Angeles Rattler test shall be 40 percent maximum.
CONSTRUCTION.
After
the material has reacted for at least 45 minutes, the asphalt-rubber
binder shall be metered into the mixing chamber of the asphalt
concrete production plant at the percentage determined by the
Engineer.
When batch type asphalt concrete plants are used to produce Type
D rubberized asphalt concrete, the asphalt-rubber binder and
mineral aggregate shall be proportioned by weight.
When continuous mixing type asphalt concrete plants are used
to produce Type D rubberized asphalt concrete, the asphalt-rubber
binder shall be proportioned by an asphalt meter of the mass
flow, coriolis effect type. The meter shall be calibrated in
accordance with California Test 109.
Type D rubberized asphalt concrete shall be spread at a temperature
of not less than 275°F nor more than 325°F, measured
in the hopper of the paving machine.
Pneumatic tired rollers shall not be used to compact Type D rubberized
asphalt concrete. Alternative compacting equipment as specified
in Section 39-6.03, "Compacting," of the Standard Specifications
shall be used to compact the Type D rubberized asphalt concrete.
Traffic shall not be allowed on the Type D rubberized asphalt
concrete for at least one hour after final rolling operations
have been completed.
When ordered by the Engineer to prevent tracking by public traffic
from the surface of Type D rubberized asphalt concrete, prior
to opening a traffic lane, sand shall be spread on the surface
at the approximate rate of from one to two pounds per square
yard. Sand shall be free from clay or organic material and shall
be of such gradation that at least 90 percent will pass the No.4
sieve and not more than 5 percent will pass a No.200 sieve. When
ordered by the Engineer, excess sand shall be removed from the
pavement surface by sweeping.
MEASUREMENT AND PAYMENT.
Rubberized
asphalt concrete (Type D-asphalt rubber) will be measured and
paid for by the ton in the same manner specified for asphalt
concrete in Section 39-8, "Measurement and Payment,"
of the Standard Specifications.
Full compensation for furnishing, spreading, and sweeping sand
cover shall be considered as included in the contract price paid
per ton for rubberized asphalt concrete (Type D-asphalt rubber),
and no separate payment will be made therefor.
10-1.
Rubberized Asphalt Concrete (Type O - Asphalt Rubber)
Rubberized
asphalt concrete (Type 0-Asphalt Rubber) shall be asphalt rubber
hot mix-open graded (ARHM-OG) and shall consist of furnishing
and mixing open graded aggregate and asphalt-rubber binder and
spreading and compacting the mixture. Type 0 rubberized asphalt
concrete shall conform to the requirements specified for open
graded asphalt concrete in Section 39, "Asphalt Concrete,"
of the Standard Specifications and these special provisions.
The last sentence of the first paragraph in Section 39-2.01,
"Asphalts," of the Standard Specifications and the
fifth, sixth, seventh, and eighth paragraphs of Section 39-3.03,
"Proportioning," of the Standard Specifications shall
not apply to Type 0 rubberized asphalt concrete.
The second paragraph in Section 39-3.05, "Asphalt Concrete
and Asphalt Concrete Base Storage," of the Standard Specifications
is amended to read:
Storage silos shall be equipped with a surge-batcher sized to
hold a minimum of 4,000 pounds of material. A surge-batcher consists
of equipment placed at the top of the storage silo which catches
the continuous delivery of the completed mix and changes it to
individual batch delivery and prevents the segregation of product
ingredients as the completed mix is placed into storage. The
surge-batcher shall be center loading and shall be thermally
insulated or heated or thermally insulated and heated to prevent
material buildup. Rotary chutes shall not be used as surgebatchers.
The surge-batcher shall be independent and distinct from conveyors
or chutes used to collect or direct the completed mixture being
discharged into storage silos and shall be the last device to
handle the material before it enters the silo. Multiple storage
silos shall be served by an individual surge-batcher for each
silo. Material handling shall be free of oblique movement between
the highest elevation (conveyor outfall) and subsequent placement
in the silo. Discharge gates on surge-batchers shall be automatic
in operation and shall discharge only after a minimum of 4,000
pounds of material has been collected and shall close before
the last collected material leaves the device. Discharge gate
design shall prevent the deflection of material during the opening
and closing operation.
GENERAL.
Binder
for Type 0 rubberized asphalt concrete shall be, at the Contractor's
option, either Type 1 or Type 2 asphalt-rubber binder conforming
to the requirements of these special provisions.
The amount of asphalt-rubber binder to be mixed with the aggregate
for Type 0 rubberized asphalt concrete will be determined by
the Engineer using the samples of aggregates furnished by the
Contractor in conformance with Section 39-3.03, "Proportioning,"
of the Standard Specifications. The Engineer will determine the
amount of asphalt-rubber binder to be mixed with the aggregate
in accordance with California Test 368, except the test temperature
in Section D, "Test Procedure," shall be 325°F.
The temperature of the aggregate at the time the asphalt-rubber
binder is added shall be not more than 325°F.
ASPHALT-RUBBER BINDER.
The
grade of paving asphalt to be used in asphalt-rubber binder will
be either grade AR-i 000, AR-2000, or AR-4000, as determined
by the Engineer from recommendation by the asphalt-rubber binder
supplier.
The reclaimed vulcanized rubber shall be produced primarily from
the processing of automobile and truck tires. The rubber shall
be produced by ambient temperature grinding processes only.
The specific gravity of reclaimed vulcanized ground rubber shall
be not less than 1.10 nor more than 1.20, and shall conform to
the following gradation when tested in accordance with ASTM Designation
C 136:
| Sieve Size | Percent Passing |
| No. 8 | 100 |
| No. 10 | 95-100 |
| No. 16 | 40-80 |
| No. 30 | 5-30 |
| No. 50 | 0-15 |
| No. 200 | 0-3 |
Rubber
for use in asphalt-rubber binder shall be free of loose fabric,
wire, and other contaminants except that up to 4 percent (by
weight of rubber) calcium carbonate or talc may be added to prevent
caking or sticking of the particles together. The rubber shall
be sufficiently dry so as to be free flowing and not produce
foaming when blended with the hot paving asphalt.
At least two weeks before its intended use, the Contractor shall
furnish samples of the asphalt-rubber binder proposed for use
on the project. The samples shall consist of 4 one-quart size
cans of the asphalt-rubber binder, together with the formulation
and the grade of paving asphalt used.
The method and equipment for combining the rubber and paving
asphalt shall be so designed and accessible that the Engineer
can readily determine the percentage by weight for each material
being incorporated into the mixture.
Equipment utilized in the production and proportioning of asphalt-rubber
binder shall include the following:
An asphalt heating tank with hot oil heat transfer to heat the
paving asphalt to the necessary temperature before blending with
the granulated rubber. This unit shall be equipped with a thermostatic
heat control device.
A mechanical blender for proper proportioning and thorough mixing
of the paving asphalt and rubber. This unit shall have both an
asphalt totalizing meter (gallons or liters) and a flow rate
meter (gallons per minute or liters per minute).
An asphalt-rubber binder storage tank equipped with a heating
system to maintain the proper temperature of the binder and an
internal mixing unit capable of maintaining a homogeneous mixture
of asphalt and rubber.
The asphalt-rubber mixture shall not be used as a binder after
it has been retained for more than 48 hours.
TYPE 1 BINDER.
Type
1 asphalt-rubber binder shall be a uniform and reacted mixture
of compatible paving grade asphalt and reclaimed vulcanized rubber.
The length of the individual rubber particles shall not exceed
3/16 inch.
Type 1 asphalt-rubber binder shall contain not less than 14 percent
nor more than 20 percent rubber, by weight, of the total asphalt-rubber
binder.
The temperature of the paving asphalt shall be between 350°F
and 425°F at the time the rubber is blended with the paving
asphalt. The paving asphalt and rubber shall be combined and
mixed together in a blender unit, pumped into the agitated storage
tank, and then reacted for a minimum of 45 minutes from the time
the rubber is added to the paving asphalt. The asphalt-rubber
binder shall be maintained at a temperature of not less than
325°F nor more than 375°F during the reaction period.
The viscosity of the asphalt-rubber binder after the reaction
period, when tested in accordance with ASTM Designation D 2196,
shall be not less than 1,500 centipoise nor more than 3,000 centipoise
at 350°F (Brookfield).
The asphalt-rubber binder, after reaching the desired consistency,
shall not be held at temperatures over 325°F for more than
4 hours.
TYPE 2 BINDER.
Type
2 asphalt-rubber binder shall be a uniform and reacted mixture
of compatible paving grade asphalt, extender oil, natural rubber,
and reclaimed vulcanized rubber.
Extender oil shall be a resinous, high flash point, aromatic
hydrocarbon conforming to the following:
| Test | ASTM Designation |
Requirement |
| Viscosity, SSU, at 100°F | D 88 | 2,500 Min. |
| Flash Point, COC, °F | D 92 | 390 min. |
| Molecular
Analysis: Asphaltenes, percent by weight |
D 2007 |
0.1 max |
| Aromatics, percent by weight |
D 2007 | 55 min. |
The
paving asphalt and extender oil, when combined, shall form a
material that is chemically compatible with the rubber.
The extender oil shall be added to the paving asphalt at a rate
of not less than 2 percent nor more than 6 percent by weight
of the paving asphalt, the exact amount to be as determined by
the Engineer from recommendation by the asphalt-rubber binder
supplier. The asphalt shall be at a temperature of not less than
350°F nor more than 425°F when the extender oil is added.
Rubber for use in Type 2 asphalt-rubber binder shall consist
of reclaimed vulcanized rubber and shall contain not less than
20 percent nor more than 30 percent, by weight, natural rubber,
when tested in accordance with ASTM Designation D 297. The rubber
shall contain no particles longer than 1/4 inch in length.
The paving asphalt-extender oil blend and rubber shall be combined
and mixed together in the blender unit to produce a homogeneous
mixture.
The amount of rubber to be added to the paving asphalt-extender
oil blend shall be not less than 17 percent nor more than 23
percent by weight of the combined mixture of paving asphalt,
extender oil, and rubber. The exact amount will be as determined
by the Engineer from recommendation by the asphalt-rubber binder
supplier. The paving asphalt-extender oil blend shall be at a
temperature of not less than 350°F nor more than 425°F
when the rubber is added.
The asphalt-rubber binder shall be reacted for a minimum of 45
minutes from the time the rubber is added to the paving asphalt-extender
oil blend. The asphalt-rubber binder shall be maintained at a
temperature between 375°F and 425°F during the reaction
period.
The viscosity of the asphalt-rubber binder after the reaction
period, when tested in accordance with ASTM Designation D 2196,
shall be not less than 1,500 centipoise nor more than 3,000 centipoise
at 375°F (Brookfield).
The asphalt-rubber binder, after reaching the desired consistency,
shall not be held at temperatures over 375°F for more than
4 hours.
AGGREGATE.
The aggregate for Type 0 rubberized asphalt concrete shall conform to 1/2 inch maximum open graded asphalt concrete aggregate specified in Section 39-2.02, "Aggregate," of the Standard Specifications.
CONSTRUCTION.
After
the material has reacted for at least 45 minutes, the asphalt-rubber
binder shall be metered into the mixing chamber of the asphalt
concrete production plant at the percentage determined by the
Engineer.
If the Contractor selects the batch mixing method, asphalt concrete
shall be produced by the automatic batch mixing method as provided
in Section 39-3.03A(1 b), "Automatic Proportioning,"
of the Standard Specifications.
When batch type asphalt concrete plants are used to produce Type
0 rubberized asphalt concrete, the asphalt-rubber binder and
mineral aggregate shall be proportioned by weight.
When continuous mixing type asphalt concrete plants are used
to produce Type 0 rubberized asphalt concrete, the asphalt-rubber
binder shall be proportioned by an asphalt meter of the mass
flow, coriolis effect type. The meter shall be calibrated in
accordance with California Test 109.
Type 0 rubberized asphalt concrete shall be spread at a temperature
of not less than 275°F nor more than 325°F, measured
in the hopper of the paving machine. Type 0 rubberized asphalt
concrete shall be placed only when the atmospheric temperature
is above 45°F.
The area to which paint binder has been applied shall be closed
to public traffic. Care shall be taken to avoid tracking binder
material onto existing pavement surfaces beyond the limits of
construction.
In addition to the requirements in Section 39-5.01, "Spreading
Equipment," of the Standard Specifications, asphalt paving
equipment shall be equipped with automatic screed controls and
a sensing device or devices.
When paving contiguously with previously placed mats, the end
of the screed adjacent to the previously placed mat shall be
controlled by a sensor that responds to the grade of the previously
placed mat and will reproduce the grade in the new mat within
a 0.01-foot tolerance.
Should the methods and equipment furnished by the Contractor
fail to produce a layer of asphalt concrete conforming to the
requirements, including straightedge tolerance, of Section 39-6.03,
"Compacting," of the Standard Specifications, the paving
operations shall be discontinued and the Contractor shall modify
his equipment or furnish substitute equipment.
Should the automatic screed controls fail to operate properly
during any day's work, the Contractor may use manual control
of the spreading equipment for the remainder of that day; however,
the equipment shall be corrected or replaced with alternative
automatically controlled equipment conforming to the requirements
in this section before starting another day's work.
Traffic shall not be allowed on the Type 0 rubberized asphalt
concrete for at least one hour after final rolling operations
have been completed.
When ordered by the Engineer to prevent tracking by public traffic
from the surface of Type 0 rubberized asphalt concrete, prior
to opening a traffic lane, sand shall be spread on the surface
at the approximate rate of from one to two pounds per square
yard. Sand shall be free from clay or organic material and shall
be of such gradation that at least 90 percent will pass the No.4
sieve and not more than 5 percent will pass a No.200 sieve. When
ordered by the Engineer, excess sand shall be removed from the
pavement surface by sweeping.
MEASUREMENT AND PAYMENT.
Rubberized
asphalt concrete (Type 0-asphalt rubber) will be measured and
paid for by the ton in the same manner specified for asphalt
concrete in Section 39-8, "Measurement and Payment,"
of the Standard Specifications.
Full compensation for furnishing, spreading, and sweeping sand
cover shall be considered as included in the contract price paid
per ton for rubberized asphalt concrete (Type 0-asphalt rubber),
and no separate payment will be made therefor.